Project Description

AUSTRIA – Office building

The office building was built in 2015 in the Austrian province of Burgenland. The gross floor area is approx. 752 m² and it is equipped with a combination of different HVAC systems: condensing heat boiler, geothermal heat pump, air conditioning and ventilation system, different heat emission systems etc. Besides office spaces it offers laboratory facilities for research purposes related to smart and renewable energy systems, BACS and building automation etc. The building is already equipped with comprehensive metering facilities (e.g. electricity consumption for different services, heat meters, indoor comfort parameters, temperatures and pressure, occupancy etc.), which provide valuable data with high resolution for the testing and validation process of ePANACEA. More information about the building is available at Forschung Burgenland.

Back to list of Case Studies

Office building. Photo by Forschung Burgenland.
Office building. Image by Forschung Burgenland.

QUANTITATIVE DATA

Total primary energy demand 222,40 kWh/m²a
Specific CO2 emissions 37,50 kg/m²a
Average U-value of building envelope 0,391 W/m²K

OFFICE LINE

1.800.555.6789

EMERGENCY

1.800.555.0000

WORKING HOURS

9:00am – 6:00pm